Thursday, January 11, 2018

My Habu

From Wikipedia:

Habu (波布) is a Japanese name used to refer to certain venomous snakes. So; a small, Japanese Viper...

Flyin' Miata, in Palisade, CO is arguably the world's foremost authority in Miata performance, and has developed the Habu V-8 conversion to a high level. In March of last year, I dropped off my '05 Mazdaspeed for the conversion. Their build diary can be found here. Mine is the 34th conversion that they have done, and they have all the details dialed in to the max - I couldn't have done a better job with the car if I had all the time in the world (or the space to do it)!

The build diary was cut short because they were thrashing to get the car ready for me to pick up at their annual Summer Camp event in August. I was able to pick up the car and take it onto the track immediately. What a blast! The ride home was great, too, as I had them install a factory cruise control (not available on Mazdaspeeds) and the .5:1 overdrive lets it lope along on the highway. 



That is the transponder sticking out of the grille - I managed 11th fastest out of 56 - not too bad for the first day in the car on an unfamiliar track!




Since I've been home I have taken Habu to two track events at Atlanta Motorsports Park and look forward to more this season.


I must admit, the desire to devour Mustangs on the street is high, but I just think about my track days and the feeling subsides.

Regards,
 

Friday, January 5, 2018

Video Time

We are running John Deere mowing equipment here at AAC, and about a year ago they came by to get our opinions about the new A Model features. I am happy with how it came out, and John Deere had the video playing in their booth at the Golf Industry Show last year. The main reason I am posting it here today is to learn about posting videos to the blog. I have committed to producing some videos about our shop operations, including the cutting unit grinding and setup procedures, modifications, etc.
I'm sure my video skills will never approach the professional work done by Deere's crew, but it will be fun to experiment with different shots and figuring out how to explain what we do here at AAC. Here's Deere's video:
 
 

Thursday, May 4, 2017

Fine Rough

We received our new rough mowers this week, and I have been busy with prepping them for their first use this coming Monday. We decided on the Toro 4700 for a couple of reasons; first, there are seven 27" decks on each machine, which makes for a 150" width of cut. I know that some of you are doing the math and thinking 7 X 27 = 189, but the Toro design provides for over 7" of overlap between decks, which means no "mohawks" of uncut grass on slopes or in turns. We looked at the new John Deere 9009A, but it only has five decks, and the decks aren't designed to allow for fine adjustment. We also had several occurrences of mohawks when cutting on slopes. I had the Toro 4500s and 4700s at PGA National and we had very good results with them.

We are after the optimum after-cut appearance with these units, so I pulled the decks off and put them up on our Stronghand welding table to fine tune them.


Using the welding table gives us a reasonably flat (within .010" or so), repeatable surface to work with, and we can measure up through the slots to the blade tips to measure height of cut. The brackets which secure the red mower deck to the black carrier frame each have a stack of shims which can be used to dial in the blade position. They were all within 1/8" out of the box, but I was able to adjust them all to within 1/32".


It's a tough shot to get with an iPhone, but this shows a blade tip measuring 1-1/2" on-the-money.

When I first measured our old Pro Flex decks in this manner I found a total variance of 5/8" from the highest to lowest deck and had to resort to some drastic measures to get them all within 1/8". I just love it when we can make a change in the shop which makes an improvement by an order of magnitude...

I was asked to show more of the shop, specifically our chain hoists, so here you go:


The electric hoist on the left is on a swinging boom and has a 500 lb. capacity. We use it primarily for mower decks and fixed head walk mowers. The manual hoist on the right can travel down the beam to cover two bays, and comes in very handy for breaking tractors for clutch replacements, etc.

Regards,

Tuesday, February 28, 2017

Small Engine Equipment Storage - Early Spring

About the same time as I noticed we couldn't find a couple of backpack blowers when they came due for their 30-day service, we got a call from a detective who was working on the Pawn Shop detail...

Long story short; we have one fewer employee and have implemented a new way to store and keep track of our blowers and trimmers.


I thought for a while about the need to control inventory and also make it quick and easy to monitor. This chain link cage measures 7' X 20', and occupies a convenient location between our two inside facing bay doors; the wall separates the workshop from reel mower storage areas.


Each equipment item has a designated spot, and a daily check takes seconds.


I decided on 16" spacing for the vertical discharge tube hooks. The new storage location makes it very convenient for employees who are gearing up for mowing greens, as we have the mowers, blowers, mixed fuel storage, etc., all in the same area.

Our new procedure is working out well. Managers assign needed equipment, which the employees remove from the cage when needed. Employees then return the equipment to the maintenance shop after use, where a technician checks it over before returning the item to the correct location in the cage. At the end of the day, whoever is locking up that day can see quickly if something is missing.

Sprung Spring...


With the exceptionally mild Winter and early Spring we are experiencing in Atlanta, the greens have a lot of tender new growth which will need to be covered whenever frost is possible. Above is a view of 6 Green on the Highlands course getting a good heavy dusting - almost a month earlier than usual for the first topdressing of Spring. It's a good thing that all of our mowers are serviced and ready for action - and our reel grinder is always ready for a workout, which it will get soon!

Regards,

Wednesday, February 15, 2017

February 2017 Shop Photos


Here's "my" corner of the shop with the new mill and lathe, and my toolbox. We painted the walls bright white semi-gloss and installed the Armorpoxy Supratile floor tiles. Still waiting for the electrician to hook up the new machines, but I did get the mill trammed in.


I have a list of jobs ready for each of these. The mill is going to see plenty of bedknife shoes and other bits, and the lathe is going to spin all my rollers true.


The 3500 square feet of floor tiles took five of us a weekend to install. Cost was $15,000 - $5000 less than my best epoxy quote. The building is 53 years old and there was no vapor barrier used when the floor was poured. All of my epoxy quotes included an additional sealer step to ensure adhesion. The only prep needed for tile installation was a good sweeping.


Safety Center with new Eyewash Station.


New Lista benches are great for shop tool and supply storage. The left bench will have all of our two-stroke parts, supplies, and specialty tools. Doors were painted John Deere green, and the green and yellow theme fits this shop well.

Regards,

Tuesday, February 14, 2017

What; a year? (What a Year!)

Yes, yes - I know - I've been busy. In the year that I've been away, I've...

  • Changed out reel mower and utility vehicle fleets
  • Changed out the reel and bedknife grinders for SIP machines
  • Implemented new cutting unit maintenance standards and procedures
  • Updated waste oil handling equipment and procedures
  • Replaced portible fuel cans and storage cabinets
  • Authored and implemented our new GCM employee training program
  • Went through a major renovation of the Highlands course
  • Set up a shop safety center with lock out / tag out and emergency eyewash station
  • Purged over 50% of old parts inventory and negotiated penalty free credit from distributor
  • Purchased a Mazdaspeed Miata, sold the TR6, started playing with the Miata
  • Renovated the maintenance shop with new paint, flooring, and benches
  • Updated shop tools and tool storage cabinets 
  • Installed a vertical mill and lathe in the shop
  • Hosted the GGCSA annual Equipment Managers Seminar
  • Implemented new 2-stroke equipment storage and handling procedures
  • Spent quite a few hours on conference calls with the test writing team at GCSAA 
  • Went to yet another Golf Industry Show in Orlando
 ... along with the standard equipment repairs and maintenance. I'll post some follow-ups to expand on the above soon.

Regards,

Friday, February 19, 2016

Procedures...

One thing I've found to be vital for success in the shop is establishing standards and defining the most critical procedures to ensure critical operations are done the same way by everyone, all the time.  Below is what I consider our most important procedural document at AAC; "Turf Cutting Unit Maintenance Policy and Procedures":



The purpose of this document is to establish guidelines for proper reel-type cutting unit maintenance.

Policy and Procedure:
All technicians involved in the maintenance of reel-type cutting units used to mow turf at the Atlanta Athletic Club will follow the procedures outlined below in order to provide consistently high quality turf mowing and after cut appearance. Any deviation from the guidelines outlined below must be approved by the Equipment Director or Director of Agronomy. Proper personal protective equipment for cutting unit maintenance includes safety glasses. Tools used for cutting unit maintenance include a Pi Tape, micrometer, calipers, surface plate, cut test strips, and feeler gauges. Ability to read a Vernier scale is necessary to use a Pi Tape and micrometer correctly.

1.      General Guidelines:
a.       The terms “left” and “right” reference positions or directions relative to the machine operator’s orientation while operating the machine.
b.      The “leading” end of a reel references the end of the reel whose blade ends first cross the bedknife during operation.
c.       The “trailing” end of the reel is opposite the leading end.
d.      All cutting unit sets for triplex mowers and fairway mowers will be maintained in sets, and cutting unit sets will be labeled with the set number.
e.       Cutting unit position on the mower will be referenced as follows:
                                                              i.      The center cutting unit is #1.
                                                            ii.      The cutting units on the left side of the machine are even-numbered, from the center out.
                                                          iii.      The cutting units on the right side of the machine are odd-numbered, from the center out.
f.       Reels will be changed and recycled when they reach the following minimum diameters:
                                                              i.      4.650” for 5” reels.
                                                            ii.      6.650” for 7” reels.
g.      Reels for tournament-prepared greens cutting units will be inspected by the Equipment Director prior to the event and any special setup will be determined at that time.
h.      Bedknives will be changed and recycled when the top face reaches the valley floor of the top relief area, or as instructed by the Equipment Director.
i.        Greens mower bedknife front face thickness will be maintained at a maximum thickness approximately equal to half of the height of cut (HOC).
j.        Greens mower bedknife front face thickness will be maintained with less than 10% variance from leading to trailing ends. For example; if HOC is to be set at .100”, the bedknife will be ground to a .050” front face thickness, with no more than .005” difference between the leading and trailing end measurements.

2.      Post-Use Inspection and Adjustment: All reel-type cutting units will be inspected as soon as practical after each use for proper cut quality and HOC. This post-use inspection will include the following items, in order:
a.       Visually inspect cutting units for excessive debris or chaff buildup on reel blades, rollers, etc. Report excessive debris due to insufficient cleaning to a Course Supervisor or the Equipment Director.
b.      If reel blades have excessive buildup; pressure wash the reel blades, making sure to avoid spraying high pressure water near grease seals.
c.       If cutting units have little debris, proceed with blowing out the cutting unit with compressed air and inspecting the reel blades and bedknife for damage. If damage is found, coordinate cutting unit repair or replacement with the Equipment Director.
d.      Inspect all roller bearings for free play and rough rolling resistance. If there is any question that a roller bearing is serviceable, report it to the Equipment Director and coordinate replacement. Lube roller bearings if applicable and wipe any excessive grease from the unit with a shop towel.
e.       Inspect all reel bearings for free play and rough rolling resistance. If there is any question that a roller bearing is serviceable, report it to the Equipment Director and coordinate replacement. Lube reel bearings if applicable and wipe any excessive grease from the unit with a shop towel.
f.       Inspect cut quality following these steps:
                                                              i.      Insert a Toro test strip (part # 125-5610) perpendicular to the bedknife so that the test strip is between a reel blade and the leading edge of the bedknife.
                                                            ii.      Turn the reel forward to cut a ¼” piece of the test strip at each of five places along the bedknife; once near each end, once at the center, and once between the center and each end. The reel should cut the test strip cleanly with minimal effort at each location along the bedknife. Hold the test strip up to the light and check for a “fuzzy” cut.
g.      If cut quality is less than optimal, proceed by adjusting the reel to bedknife clearance following these guidelines:
                                                              i.      For John Deere QA5 cutting units; maintain a .001” minimum gap using a feeler gauge. Adjust the bedknife to the reel until correct clearance is achieved.
                                                            ii.      For John Deere QA7 cutting units; maintain a .002” minimum gap using a feeler gauge. Adjust the reel to the bedknife until there is contact, and then adjust the reel away from the bedknife until proper clearance is achieved.
                                                          iii.      For Toro cutting units; maintain a minimal amount of contact between reel and bedknife. Adjust the bedknife to the reel until correct clearance is achieved.
h.      If cut quality cannot be restored without excessive reel to bedknife contact, coordinate cutting unit sharpening with the Equipment Director.
i.        Check/adjust HOC as outlined in Section 6, Cutting Unit Assembly.

3.      Spin Grinding Reels:
a.       Each technician who will be grinding reels must first be instructed about, and fully understand, the grinder Machine Operation Manual.
b.      All reels to be ground will first be measured with a Pi Tape, and the leading/trailing diameters recorded on a grinding worksheet.
c.       Cutting units will be maintained in sets; if one reel needs to be ground, all reels in the set will be ground to maintain the following specifications:
                                                              i.      Each reel in the set will be maintained within .020” diameter of each other.
                                                            ii.      Each reel will measure within .005” on the leading and trailing diameter.
d.      Inspect all bearings and seals prior to mounting the cutting unit on the grinder.
e.       Each cutting unit will be checked for parallelism as part of the grinding setup.
f.       Each reel will be ground the minimum amount necessary to remove rounded edges from the reel blades
g.      The reel grinder will be cleaned with a vacuum at the end of each day the machine is used. Do not blow debris off the grinder. Track shafts and bearings will be wiped down with a dry shop towel. Do not use any lubricants or chemicals on the grinder.

4.      Relief Grinding Reels:
a.       All 5” reels will be relief ground at an approximate 30 degree angle, have a finished land width of between 10% - 15% of the blade thickness, and minimal variation between leading and trailing ends of the reel blades. Minimum diameter for relief grinding 5” reels is 4.700”.
b.      All 7” reels will be relief ground at an approximate 30 degree angle, have a finished land width of between 15% - 20% of the blade thickness, and minimal variation between leading and trailing ends of the reel blades. Minimum diameter for relief grinding 7” reels is 6.700”.
c.       The reel grinder will be cleaned with a vacuum at the end of each day the machine is used. Do not blow debris off the grinder. Track shafts and bearings will be wiped down with a dry shop towel. Do not use any lubricants or chemicals on the grinder.

5.      Grinding Bedknives:
a.       Each technician who will be grinding bedknives must first be instructed about, and fully understand, the grinder Machine Operation Manual.
b.      Visually inspect each knife to be ground for cracks or other damage. Clean knives as necessary to ensure an accurate grind and long grinding wheel life.
c.       Ensure knife grinder is set to grind the proper angles for the application prior to mounting the knife in the machine.
d.      Ensure coolant level is adequate prior to grinding.
e.       The bedknife grinder will be cleaned with a vacuum at the end of each day the machine is used. Do not blow debris off the grinder. Track shafts and bearings will be wiped down with a dry shop towel. Do not use any lubricants or chemicals on the grinder.

6.      Cutting Unit Assembly:
a.       Impact wrenches are not permitted for cutting unit assembly. Power ratchets are permitted if output torque is limited to 25 lb. ft.
b.      All bedknife screws will be tightened to 12 lb. ft. torque, in an alternating pattern from the center out, using the supplied torque wrench.
c.       All cutting unit assembly and configuration will be performed according to manufacturer’s instructions; cutting unit modifications are not permitted unless specifically authorized by the Equipment Director.
d.      HOC tolerance is +/- .001” for 5” cutting units, and +/- .003” for 7” cutting units. Report any excessive roller runout to the Equipment Director.
e.       When setting HOC, cutting units will be adjusted at least .010” low, and then HOC gradually increased to the desired setting, moving the adjusters to within .003” of target HOC, and then checking alternate sides and making any fine adjustments before moving to final HOC. HOC will not be adjusted down from an excessive HOC; if the desired HOC setting is missed, the process is repeated from the beginning.

Employee signature below constitutes employee's understanding of the Cutting Unit Maintenance Policy and Procedure.
Employee Signature    __________________________________                Date_____________
Printed Name              ___________________________________

If you were reading through the document and thinking that it seems excessive, you need to understand that cutting units are the life blood of the operation, and I've been able to achieve a certain amount of success by focusing a majority of my energy on quality of cut and after cut appearance. There is very little "extra" work involved in maintaining a higher standard once it is achieved. 
I know we will have our hands full going through all of our new cutting units when they come in this spring (factory tolerances aren't all they're cracked up to be) but once they are dialed in we can be tournament ready on short notice.
Regards,